top of page
Wind turbine

Generate your own renewable energy with wind power – wind turbines in Immingham

Wind energy is one of the most effective ways to reduce reliance on the grid and lower energy costs. Colder Volts Ltd supplies and installs high-quality wind turbines across Lincolnshire, helping homes, farms and businesses harness the UK’s natural wind resources. With expert installation, reliable technology and full support, we make wind power a practical and cost-effective solution for energy independence, reach out to us today.

First class service

Sustainable solutions

Family run business

The benefits of installing a wind turbine

• Lower energy costs – Wind is free, meaning you can generate electricity at a fraction of standard grid prices.


• Eco-friendly energy – No harmful emissions, making wind turbines a sustainable choice.


• Reliable supply – The UK’s natural wind resources ensure a consistent energy source.
 

Wind turbines and modern solar panels in the rural landscape

High-performance Kestrel wind turbines

Colder Volts Ltd is an official supplier of Kestrel wind turbines, designed for efficiency and durability. Manufactured by Eveready in South Africa, these turbines feature advanced engineering construction, making them one of the most reliable choices for residential and commercial use.

Turbine specifications
• Blade material: Fibreglass
• Height: 12-18m (39-59ft)
• Tower type: Varies by model

Flexible pricing options for all energy needs

We offer a range of wind turbine systems to suit different budgets and energy requirements, with or without battery storage.

Wind turbine only (Installed from)
• 600W: £19,000
• 800W: £20,000
• 1000W: £21,000
• 3000W: £27,000

Wind turbine + battery storage (Installed from)
• 600W: £22,500
• 800W: £25,250
• 1000W: £28,000
• 3000W: £35,750

Wind turbine on field in hill

5-step wind turbine installation

1. Free site survey – We assess your location and recommend the best turbine system.
 

2. Design wind power system – A custom solution is designed based on your energy needs.
 

3. Planning permission – We guide you through the legal process required for turbine installations.
 

4. Installation and commissioning – Systems are typically installed within 7-14 working days.
 

5. Handover and maintenance – We provide full documentation and discuss servicing plans to keep your turbine running efficiently.

“Excellent job by Dan. Went the extra mile to get my installation up and running. Highly recommended.”

Start generating your own wind energy today – contact our friendly team

Please call us on 01472 868052 or:

Contact us

Hawthorn House Townside

East Halton

​Immingham

DN40 3PS

​

Follow us

  • Facebook
  • LinkedIn
  • Google Business Profile
Yell logo

Colder Volts Ltd, registered as a limited company in England and Wales under company number: 13505158.

Registered Company Address: Hawthorn House Townside, East Halton, Immingham, DN40 3PS

Terms of Use | Privacy & Cookie Policy | Trading Terms

© 2025. The content on this website is owned by us and our licensors. Do not copy any content (including images) without our consent.

bottom of page